April 19, 2023Comments Off on Power Line Hydraulic Pumps & Motors Part l
Installation& Coding
Powerline Coding When you need to order on single pumps/motors no need to list rear section frame size, flow size or boy code.Powerline Installation – top right, tolerance signs to BS 308Powerline Installation – top left, memo is the same for pump/motor and rotation can be seen on end of drive shaft. inlet port CW rotation, outlet port CCW rotation. Inlet port CCW and outlet port CW rotation (on the right side of the pump. Top right- weights can be different with different specs. Powerline installation – top right tolerance signs to BS 308Powerline Installation – top left rotation can be seen on bottom of drive shaft. Left side of the pump – inlet port CW rotation and outlet port CCW rotation. On the right side of pump inlet port CCW rotation and outlet port CW rotation.Powerline Installation -top right tolerance signs to BS 308. Bottom left -low pressure port 1 sae. Bottom right – high pressure port 3/4 sae. Powerline Installation – Top left rotation on end of drive shaft. Memo is same for both pump/motor. Top right- weights can be different with different specs. Powerline Installation – Top right- weights can be different with different specs. Middle section – left – all flow sizes, middle – flow sizes 150 -300 overall, right – flow sizes 330-380 (the connectors and bolts to sw are used with this port. Must have a spring washer that fits under each bolt head to make sure the threads are tightened up right. Powerline Installation – top left , rotation on end of drive shaft. Left side of the pump – inlet port CW rotation and outlet port CCW rotation. On the right side of pump inlet port CCW rotation and outlet port CW rotation. Top Right – * units w/flange codes B & C tack on another 1.8 lbs. Top right – weights can be different with different specs. Powerline Frame Pump Tandem InstallationPowerline Frame Pump Tandem Installation