John Deere Crawler 755B – Instructions for Assembling a Track Roller

John Deere Crawler 755B – Instructions for Assembling a Track Roller

John Deere Crawler 755B – Instructions for Assembling a Track Roller

Comments Off on John Deere Crawler 755B – Instructions for Assembling a Track Roller

John Deere Crawler 755B – Instructions for Assembling a Track Roller

 

Assembly of Track Roller

1) Align dowel pin with the bushing flange hole and press bushings into the case. If dowel pins and holes want align, use procedures A and B.
a) Heat bushings case (3) to 300 degree F (149 degrees C) before installing bushings (1). This will expand bushing case, allowing alignment (1) flange with dowel pin (2) in bushing case (3).
b) Remove dowel pin (2). Turn bushing (1) 90 degrees to align oil holes in bushing with holes in bushing case. Press bushing (1) in case (3). Drill a 0.308 inch (7.8mm) diameter hole 0.25 inch (6.4mm) deep in bushing case using hole in bushing (1) flange as a guide.
2) Apply petroleum jelly to o ring and install o ring in o ring groove.

note: assembly of single and double flange roller are the same. This is a single flange shown

1 -bushing
2 – dowel pin
3 – bushing case
4 – disk (81 mm)
5 – o ring groove

If you need more information on this topic, please leave us a comment on our blog. And you can also call us at 800-361-0068 or email us at
info@hydrostatic-transmission.com

About the author:

Quick Links

  Home
  Services
  About
  Blog
  Store
  Contact

Social Links

Contact Information

  Address:
    1644 Eason Blvd
    Tupelo, MS 38801
  Toll Free: (800) 361-0068
  Local: +1 (662) 680-8899
  Email: info@hydrostatic-transmission.com

Back to Top